Paver calculator

Paver count for a patio, walkway or driveway — plus the base gravel and bedding sand underneath.

Calculator

Longest side, in feet.
Shorter side, in feet.
Nominal face size in inches.
4 in for patios, 8–12 in for a driveway.
Extra for cuts, spillage and mistakes.
Runs entirely in your browser — nothing you enter is uploaded or stored. Estimates only: always confirm quantities with your supplier before ordering.

Detailed breakdown

Additional quantities and assumptions
ItemQuantity
Advertisement

How to use this calculator

1

Measure

Measure the area in feet and pick your paver size. The calculator adds the base and bedding layers you'll need under it.

2

Calculate

Once you hit calculate, results update as you type. Change any number to compare options instantly.

3

Order

Print the estimate and take it to your supplier. Quantities are rounded up so you don't come up short.

Pavers, and the two layers nobody budgets for

Last reviewed: .

The paver count itself is simple area division. A 4 by 8 inch paver covers 0.222 square feet, so a 20 by 10 foot patio — 200 square feet — takes 900 pavers before waste. Add 5 percent for straight runs and 10 percent if you have curves or a diagonal pattern, which forces far more cutting.

What trips people up is everything under the pavers. That same 200 square foot patio needs 2.96 cubic yards of base gravel — about 4.1 tons — plus 0.62 cubic yards of bedding sand. Those two layers usually cost more and weigh more than the pavers, and they're what most first-time estimates leave out entirely. Note that the base figure is the loose volume you order: crushed base compacts about 20 percent, so 2.47 cubic yards in place takes 2.96 delivered.

Bedding sand is one inch, and only one inch. It's a screeded leveling layer, not a way to fix a bad base. A thicker bed lets pavers settle unevenly under load no matter how carefully you compact it, and the result shows up as ruts and rocking within a season. Use coarse concrete sand, never mason sand or play sand.

There is a third sand in this job, and it is not the bedding sand. Once the pavers are down and compacted, the joints between them get filled from the top, and what goes in there is polymeric sand: a jointing sand with a binder that sets when you mist it. It locks the field together, keeps weeds down and stops the joints washing out in rain. Ordinary sand in the joints washes away by the second season. Polymeric sand is sold by the bag with a coverage figure that depends on your joint width and paver thickness, so read the bag rather than scaling it from the area.

Base depth is what separates a patio from a driveway. Four inches of compacted crushed base is enough for foot traffic; a driveway wants 8 to 12 inches, placed and compacted in lifts of no more than 4 inches each. And every paved area needs an edge restraint around the perimeter — without it the outer courses creep outward and the field loosens from the edges inward.

Advertisement

Frequently asked questions

How many 4x8 pavers per square foot?

Four and a half. A 4 by 8 inch paver covers 0.222 square feet, so a 200 square foot patio takes about 900 pavers before waste.

How much base do I need under pavers?

Four inches of compacted crushed base for a patio or walkway, 8 to 12 inches for a driveway. A 200 square foot patio needs about 2.96 cubic yards, or 4.1 tons, ordered loose — that compacts down to the 2.47 cubic yards you actually want in place.

How thick should bedding sand be under pavers?

Exactly one inch, screeded level. Thicker beds let pavers settle unevenly. Use coarse concrete sand, not mason or play sand.

How much waste should I add for pavers?

Five percent for a straight running-bond layout, 10 percent for curves, circles or a 45-degree herringbone, which needs far more cutting.

Do I need edge restraint around pavers?

Yes. Without a restraint the perimeter pavers migrate outward under load and the whole field loosens from the edges inward. Budget for the full perimeter.

What sand goes between the pavers?

Polymeric sand, which is a jointing sand with a binder that sets when misted. It is not the same as the bedding sand underneath. Plain sand in the joints washes out within a season or two.

Do I have to compact the base in layers?

Yes, in lifts of no more than about 4 inches. A single deep lift compacts only near the surface, and the rest settles later under the pavers you already laid.